Helebridge Area
Various works have been and are being done. The basin has been dredged and and "bungs" across the Canal below the inclined plan have been removed and the channel reinstated. The inclined plane lower slope has been cleared to give a better understanding of how it was when it was in use. Other works in this area are to be completed. On the Bude side of the A39 road bridge a landing stage is being constructed for use by canoeists and small boats. At Whalesborough Weir a flow measuring is to be installed to aid the splitting of water 50/50 between the Canal and the River Neet.
09canalscan073
09canalscan074
09canalscan089
09canalscan090
09canalscan091
09canalscan092
09canalscan093
09canalscan094
09canalscan095
09canalscan096
09canalscan097
09canalscan098
09canalscan099
09canalscan100
09canalscan101
09canalscan102
09canalscan103
09canalscan104
09canalscan105
09canalscan106
newnext371
newnext351
newnext352
newnext353
newnext354
newnext355
newnext356
newnext357
newnext358
newnext362
newnext363
newnext364
newnext365
newnext366
newnext367
newnext368
newnext369
newnext370
budecanalnew116
budecanalnew117
budecanalnew118
budecanalnew119
budecanalnew120
budecanalnew121
budecanal070
Up one level